Existing Potable Water Network, Under Construction Gravity Sewer, Designated Corridor for 22Kv Feeding Sewerage P.S, 22 Kv Cable Corridor depicting the back filled area, Geotechnical Investigation, Earth Works, Roads & Pavings, Storm Water Drainage Network, Treated Sewerage Effulent (TSE) Line, Telecom Network, Electrical LV & MV, Street Lighting, Potable Water, Traffic Control System, MCC Network, Landscape Value: AED 39.9 millio

  • Project Category:

    ONGOING
  • Location:

    Abu Dhabi,UAE
  • Company:

    National Projects & Construction
  • Client:

    M/s Bunya Enterprises
  • Consultant:

    Design & Build Project TBA
  • Duration:

    15 Months

projects of similar category